{"_id":"HLguDLhGvfp5CRbLb","bibbaseid":"llamas-colditz-ressl-jurado-argumedo-victoria-meneses-generatinganationallandcoverdatasetformexicoat30mspatialresolutionintheframeworkofthenalcmsproject-2017","author_short":["Llamas, R. M.","Colditz, R. R.","Ressl, R. A.","Jurado, D.","Argumedo, J.","Victoria, A.","Meneses, C."],"bibdata":{"bibtype":"inproceedings","type":"inproceedings","address":"New Orleans, LA, USA","title":"Generating a National Land Cover Dataset for Mexico at 30m Spatial Resolution in the Framework of the NALCMS Project","url":"https://ui.adsabs.harvard.edu/abs/2017AGUFMGC52C..03L/abstract","booktitle":"In American Geophysical Union, Fall Meeting, December 11-15, 2017","publisher":"American Geophysical Union","author":[{"propositions":[],"lastnames":["Llamas"],"firstnames":["Ricardo","M."],"suffixes":[]},{"propositions":[],"lastnames":["Colditz"],"firstnames":["René","R."],"suffixes":[]},{"propositions":[],"lastnames":["Ressl"],"firstnames":["Rainer","A."],"suffixes":[]},{"propositions":[],"lastnames":["Jurado"],"firstnames":["Daniela"],"suffixes":[]},{"propositions":[],"lastnames":["Argumedo"],"firstnames":["Jesús"],"suffixes":[]},{"propositions":[],"lastnames":["Victoria"],"firstnames":["Arturo"],"suffixes":[]},{"propositions":[],"lastnames":["Meneses"],"firstnames":["Carmen"],"suffixes":[]}],"year":"2017","keywords":"NALCMS","bibtex":"@inproceedings{llamas_generating_2017,\n\taddress = {New Orleans, LA, USA},\n\ttitle = {Generating a {National} {Land} {Cover} {Dataset} for {Mexico} at 30m {Spatial} {Resolution} in the {Framework} of the {NALCMS} {Project}},\n\turl = {https://ui.adsabs.harvard.edu/abs/2017AGUFMGC52C..03L/abstract},\n\tbooktitle = {In {American} {Geophysical} {Union}, {Fall} {Meeting}, {December} 11-15, 2017},\n\tpublisher = {American Geophysical Union},\n\tauthor = {Llamas, Ricardo M. and Colditz, René R. and Ressl, Rainer A. and Jurado, Daniela and Argumedo, Jesús and Victoria, Arturo and Meneses, Carmen},\n\tyear = {2017},\n\tkeywords = {NALCMS},\n}\n\n\n\n","author_short":["Llamas, R. M.","Colditz, R. R.","Ressl, R. A.","Jurado, D.","Argumedo, J.","Victoria, A.","Meneses, C."],"key":"llamas_generating_2017","id":"llamas_generating_2017","bibbaseid":"llamas-colditz-ressl-jurado-argumedo-victoria-meneses-generatinganationallandcoverdatasetformexicoat30mspatialresolutionintheframeworkofthenalcmsproject-2017","role":"author","urls":{"Paper":"https://ui.adsabs.harvard.edu/abs/2017AGUFMGC52C..03L/abstract"},"keyword":["NALCMS"],"metadata":{"authorlinks":{}}},"bibtype":"inproceedings","biburl":"https://bibbase.org/zotero/NAAtlas","dataSources":["yRJdyJoax6GFubwNS","WChDenW3ipDLTib3G","wszmZbW485BrvbZff","3fS6y29xitMxSyCmw","SmeabbQSEFozkXJuC","3cx6m8LrzQx6SsjF2"],"keywords":["nalcms"],"search_terms":["generating","national","land","cover","dataset","mexico","30m","spatial","resolution","framework","nalcms","project","llamas","colditz","ressl","jurado","argumedo","victoria","meneses"],"title":"Generating a National Land Cover Dataset for Mexico at 30m Spatial Resolution in the Framework of the NALCMS Project","year":2017}