generated by bibbase.org
  2021 (1)
Biobjective Scheduling for Joint Parallel Machines with Sequence-Dependent Setup by Taking Pareto-Based Approach. Srisuruk, W.; Sudtachat, K.; and Horkaew, P. Modelling and Simulation in Engineering, 2021: 1–19. 2021.
link   bibtex  
  2014 (2)
A study of big data processing constraints on a low-power Hadoop cluster. Kaewkasi, C.; and Srisuruk, W. In 2014 International Computer Science and Engineering Conference (ICSEC), pages 267–272, 2014. IEEE
link   bibtex  
Optimizing performance and power consumption for an ARM-based big data cluster. Kaewkasi, C.; and Srisuruk, W. In TENCON 2014-2014 IEEE Region 10 Conference, pages 1–6, 2014. IEEE
link   bibtex  
  2009 (1)
Tabu search approach to solve routing issues in communication networks. Oonsivilai, A.; Srisuruk, W.; Marungsri, B.; and Kulworawanichpong, T. International Journal of Electronics and Communication Engineering, 3(5): 1211–1214. 2009.
link   bibtex  
  undefined (1)
Low-Power Big Data Cluster. Srisuruk, W.; and Kaewkasi, C. Low-Power Big Data Cluster. .
link   bibtex