Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: A Mine Planning Case Study. Burt, C. N., Lipovetzky, N., Pearce, A. R., & Stuckey, P. J. In CPAIOR, volume 9075, of Lecture Notes in Computer Science, pages 91-107, 2015. Springer.
Link
Paper bibtex @inproceedings{conf/cpaior/BurtLPS15,
added-at = {2017-06-02T00:00:00.000+0200},
author = {Burt, Christina N. and Lipovetzky, Nir and Pearce, Adrian R. and Stuckey, Peter J.},
biburl = {https://www.bibsonomy.org/bibtex/2f75153f2283602545e590ba80c11ec42/dblp},
booktitle = {CPAIOR},
crossref = {conf/cpaior/2015},
editor = {Michel, Laurent},
ee = {https://doi.org/10.1007/978-3-319-18008-3_7},
interhash = {ae838e5e0d114f64fef0cb13f587cafe},
intrahash = {f75153f2283602545e590ba80c11ec42},
isbn = {978-3-319-18007-6},
keywords = {dblp},
pages = {91-107},
publisher = {Springer},
series = {Lecture Notes in Computer Science},
timestamp = {2019-05-15T17:54:54.000+0200},
title = {Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: A Mine Planning Case Study.},
url = {http://dblp.uni-trier.de/db/conf/cpaior/cpaior2015.html#BurtLPS15},
volume = 9075,
year = 2015
}
Downloads: 0
{"_id":"F4MYHej8HWai4cywD","bibbaseid":"burt-lipovetzky-pearce-stuckey-schedulingwithfixedmaintenancesharedresourcesandnonlinearfeedrateconstraintsamineplanningcasestudy-2015","downloads":0,"creationDate":"2015-07-01T06:12:27.620Z","title":"Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: A Mine Planning Case Study.","author_short":["Burt, C. N.","Lipovetzky, N.","Pearce, A. R.","Stuckey, P. J."],"year":2015,"bibtype":"inproceedings","biburl":"http://www.bibsonomy.org/bib/author/nir lipovetzky?items=1000","bibdata":{"bibtype":"inproceedings","type":"inproceedings","added-at":"2017-06-02T00:00:00.000+0200","author":[{"propositions":[],"lastnames":["Burt"],"firstnames":["Christina","N."],"suffixes":[]},{"propositions":[],"lastnames":["Lipovetzky"],"firstnames":["Nir"],"suffixes":[]},{"propositions":[],"lastnames":["Pearce"],"firstnames":["Adrian","R."],"suffixes":[]},{"propositions":[],"lastnames":["Stuckey"],"firstnames":["Peter","J."],"suffixes":[]}],"biburl":"https://www.bibsonomy.org/bibtex/2f75153f2283602545e590ba80c11ec42/dblp","booktitle":"CPAIOR","crossref":"conf/cpaior/2015","editor":[{"propositions":[],"lastnames":["Michel"],"firstnames":["Laurent"],"suffixes":[]}],"ee":"https://doi.org/10.1007/978-3-319-18008-3_7","interhash":"ae838e5e0d114f64fef0cb13f587cafe","intrahash":"f75153f2283602545e590ba80c11ec42","isbn":"978-3-319-18007-6","keywords":"dblp","pages":"91-107","publisher":"Springer","series":"Lecture Notes in Computer Science","timestamp":"2019-05-15T17:54:54.000+0200","title":"Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: A Mine Planning Case Study.","url":"http://dblp.uni-trier.de/db/conf/cpaior/cpaior2015.html#BurtLPS15","volume":"9075","year":"2015","bibtex":"@inproceedings{conf/cpaior/BurtLPS15,\n added-at = {2017-06-02T00:00:00.000+0200},\n author = {Burt, Christina N. and Lipovetzky, Nir and Pearce, Adrian R. and Stuckey, Peter J.},\n biburl = {https://www.bibsonomy.org/bibtex/2f75153f2283602545e590ba80c11ec42/dblp},\n booktitle = {CPAIOR},\n crossref = {conf/cpaior/2015},\n editor = {Michel, Laurent},\n ee = {https://doi.org/10.1007/978-3-319-18008-3_7},\n interhash = {ae838e5e0d114f64fef0cb13f587cafe},\n intrahash = {f75153f2283602545e590ba80c11ec42},\n isbn = {978-3-319-18007-6},\n keywords = {dblp},\n pages = {91-107},\n publisher = {Springer},\n series = {Lecture Notes in Computer Science},\n timestamp = {2019-05-15T17:54:54.000+0200},\n title = {Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: A Mine Planning Case Study.},\n url = {http://dblp.uni-trier.de/db/conf/cpaior/cpaior2015.html#BurtLPS15},\n volume = 9075,\n year = 2015\n}\n\n","author_short":["Burt, C. N.","Lipovetzky, N.","Pearce, A. R.","Stuckey, P. J."],"editor_short":["Michel, L."],"key":"conf/cpaior/BurtLPS15","id":"conf/cpaior/BurtLPS15","bibbaseid":"burt-lipovetzky-pearce-stuckey-schedulingwithfixedmaintenancesharedresourcesandnonlinearfeedrateconstraintsamineplanningcasestudy-2015","role":"author","urls":{"Link":"https://doi.org/10.1007/978-3-319-18008-3_7","Paper":"http://dblp.uni-trier.de/db/conf/cpaior/cpaior2015.html#BurtLPS15"},"keyword":["dblp"],"downloads":0},"search_terms":["scheduling","fixed","maintenance","shared","resources","nonlinear","feedrate","constraints","mine","planning","case","study","burt","lipovetzky","pearce","stuckey"],"keywords":["dblp"],"authorIDs":[],"dataSources":["aEEaeDThvykek5NpC"]}