Probabilistic Analysis and Practical Algorithms for the Flow Shop Weighted Completion Time Problem. Kaminsky, P. & Simchi-Levi, D. Operations Research, 46(6):872-882, 1998.
Probabilistic Analysis and Practical Algorithms for the Flow Shop Weighted Completion Time Problem. [link]Link  Probabilistic Analysis and Practical Algorithms for the Flow Shop Weighted Completion Time Problem. [link]Paper  bibtex   
@article{journals/ior/KaminskyS98,
  author = {Kaminsky, Philip and Simchi-Levi, David},
  ee = {http://dx.doi.org/10.1287/opre.46.6.872},
  interhash = {f178e1c5bee0cdebe677c9b94f4e96f7},
  intrahash = {cad53079c9b418df3a26350c127f1c4d},
  journal = {Operations Research},
  number = 6,
  pages = {872-882},
  title = {Probabilistic Analysis and Practical Algorithms for the Flow Shop Weighted Completion Time Problem.},
  url = {http://dblp.uni-trier.de/db/journals/ior/ior46.html#KaminskyS98},
  volume = 46,
  year = 1998
}

Downloads: 0