Demand-Driven Hierachical Integrated Planning-Scheduling Control for a Mobile Robot-Operated Flexible Smart Manufacturing System. Li, C., Bhatta, K., Waseem, M., & Chang, Q. Unknown Journal, 2024.
Demand-Driven Hierachical Integrated Planning-Scheduling Control for a Mobile Robot-Operated Flexible Smart Manufacturing System [link]Paper  bibtex   
@article{758,
  author = {Chen Li and Kshitij Bhatta and Muhammad Waseem and Qing Chang},
  title = {Demand-Driven Hierachical Integrated Planning-Scheduling Control for a Mobile Robot-Operated Flexible Smart Manufacturing System},
  year = {2024},
  journal = {Unknown Journal},
  url = {https://doi.org/10.2139/ssrn.4753097}
}

Downloads: 0