Demand-driven hierarchical integrated planning-scheduling control for a mobile robot-operated flexible smart manufacturing system. Li, C., Bhatta, K., Waseem, M., & Chang, Q. Robotics Comput. Integr. Manuf., 95:103015, 2025.
Demand-driven hierarchical integrated planning-scheduling control for a mobile robot-operated flexible smart manufacturing system [link]Paper  doi  bibtex   
@article{DBLP:journals/rcim/LiBWC25,
  author       = {Chen Li and
                  Kshitij Bhatta and
                  Muhammad Waseem and
                  Qing Chang},
  title        = {Demand-driven hierarchical integrated planning-scheduling control
                  for a mobile robot-operated flexible smart manufacturing system},
  journal      = {Robotics Comput. Integr. Manuf.},
  volume       = {95},
  pages        = {103015},
  year         = {2025},
  url          = {https://doi.org/10.1016/j.rcim.2025.103015},
  doi          = {10.1016/J.RCIM.2025.103015},
  timestamp    = {Tue, 01 Apr 2025 01:00:00 +0200},
  biburl       = {https://dblp.org/rec/journals/rcim/LiBWC25.bib},
  bibsource    = {dblp computer science bibliography, https://dblp.org}
}

Downloads: 0