Interactive, Repair-Based Planning and Scheduling for Shuttle Payload Operations. Rabideau, G., Chien, S., Stone, P., Willis, J., Eggemeyer, C., & Mann, T. In IEEE Aerospace Conference (IEEE-Aero 1997), pages 325–341, Aspen, CO, February, 1997. bibtex @inproceedings{rabideau-chien-stone-et-al-1997,
title = {Interactive, Repair-Based Planning and Scheduling for Shuttle Payload Operations},
author = {G. Rabideau and S. Chien and P. Stone and J. Willis and C. Eggemeyer and T. Mann},
year = 1997,
month = {February},
booktitle = {IEEE Aerospace Conference (IEEE-Aero 1997)},
address = {Aspen, CO},
pages = {325--341}
}
Downloads: 0
{"_id":"Hfbkemo85cRap4NYu","bibbaseid":"rabideau-chien-stone-willis-eggemeyer-mann-interactiverepairbasedplanningandschedulingforshuttlepayloadoperations-1997","author_short":["Rabideau, G.","Chien, S.","Stone, P.","Willis, J.","Eggemeyer, C.","Mann, T."],"bibdata":{"bibtype":"inproceedings","type":"inproceedings","title":"Interactive, Repair-Based Planning and Scheduling for Shuttle Payload Operations","author":[{"firstnames":["G."],"propositions":[],"lastnames":["Rabideau"],"suffixes":[]},{"firstnames":["S."],"propositions":[],"lastnames":["Chien"],"suffixes":[]},{"firstnames":["P."],"propositions":[],"lastnames":["Stone"],"suffixes":[]},{"firstnames":["J."],"propositions":[],"lastnames":["Willis"],"suffixes":[]},{"firstnames":["C."],"propositions":[],"lastnames":["Eggemeyer"],"suffixes":[]},{"firstnames":["T."],"propositions":[],"lastnames":["Mann"],"suffixes":[]}],"year":"1997","month":"February","booktitle":"IEEE Aerospace Conference (IEEE-Aero 1997)","address":"Aspen, CO","pages":"325–341","bibtex":"@inproceedings{rabideau-chien-stone-et-al-1997,\n\ttitle = {Interactive, Repair-Based Planning and Scheduling for Shuttle Payload Operations},\n\tauthor = {G. Rabideau and S. Chien and P. Stone and J. Willis and C. Eggemeyer and T. Mann},\n\tyear = 1997,\n\tmonth = {February},\n\tbooktitle = {IEEE Aerospace Conference (IEEE-Aero 1997)},\n\taddress = {Aspen, CO},\n\tpages = {325--341}\n}\n","author_short":["Rabideau, G.","Chien, S.","Stone, P.","Willis, J.","Eggemeyer, C.","Mann, T."],"key":"rabideau-chien-stone-et-al-1997","id":"rabideau-chien-stone-et-al-1997","bibbaseid":"rabideau-chien-stone-willis-eggemeyer-mann-interactiverepairbasedplanningandschedulingforshuttlepayloadoperations-1997","role":"author","urls":{},"metadata":{"authorlinks":{}}},"bibtype":"inproceedings","biburl":"https://bibbase.org/network/files/pG3rqgMjQD7YDK9mR","dataSources":["fFKv7kkLuCZPtfsiH","QvdbtaigAhR3B2gH3","iio6zGurPy7pYDJ9F","7GgPNiWYdtt4b5kSC","NB9ixES8hSEaR9Gwy","otDTeas5CXZSvBqHe","nAFgNmfG8PMQcD23r","RWAD52BGFcfgL6j7S"],"keywords":[],"search_terms":["interactive","repair","based","planning","scheduling","shuttle","payload","operations","rabideau","chien","stone","willis","eggemeyer","mann"],"title":"Interactive, Repair-Based Planning and Scheduling for Shuttle Payload Operations","year":1997}