A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations. Xiong, J., Chen, Y., Yang, K., Zhao, Q., & Xing, L. Mathematical Problems in Engineering, 2012. Article Number: 786923bibtex @article{Xiong12c,
author = {Jian Xiong and Ying-wu Chen and Ke-wei Yang and Qing-song Zhao and Li-ning Xing},
title = {{A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations}},
journal = {Mathematical Problems in Engineering},
note = {Article Number: 786923},
year = {2012},
}
Downloads: 0
{"_id":"92EXQcbvHbQPv4rGs","bibbaseid":"xiong-chen-yang-zhao-xing-ahybridmultiobjectivegeneticalgorithmforrobustresourceconstrainedprojectschedulingwithstochasticdurations-2012","downloads":0,"creationDate":"2016-04-20T19:53:49.836Z","title":"A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations","author_short":["Xiong, J.","Chen, Y.","Yang, K.","Zhao, Q.","Xing, L."],"year":2012,"bibtype":"article","biburl":"http://delta.cs.cinvestav.mx/~ccoello/EMOO/EMOO.bib","bibdata":{"bibtype":"article","type":"article","author":[{"firstnames":["Jian"],"propositions":[],"lastnames":["Xiong"],"suffixes":[]},{"firstnames":["Ying-wu"],"propositions":[],"lastnames":["Chen"],"suffixes":[]},{"firstnames":["Ke-wei"],"propositions":[],"lastnames":["Yang"],"suffixes":[]},{"firstnames":["Qing-song"],"propositions":[],"lastnames":["Zhao"],"suffixes":[]},{"firstnames":["Li-ning"],"propositions":[],"lastnames":["Xing"],"suffixes":[]}],"title":"A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations","journal":"Mathematical Problems in Engineering","note":"Article Number: 786923","year":"2012","bibtex":"@article{Xiong12c,\n author = {Jian Xiong and Ying-wu Chen and Ke-wei Yang and Qing-song Zhao and Li-ning Xing},\n title = {{A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations}},\n journal = {Mathematical Problems in Engineering},\n note = {Article Number: 786923},\n year = {2012}, \n}\n\n","author_short":["Xiong, J.","Chen, Y.","Yang, K.","Zhao, Q.","Xing, L."],"key":"Xiong12c","id":"Xiong12c","bibbaseid":"xiong-chen-yang-zhao-xing-ahybridmultiobjectivegeneticalgorithmforrobustresourceconstrainedprojectschedulingwithstochasticdurations-2012","role":"author","urls":{},"downloads":0},"search_terms":["hybrid","multiobjective","genetic","algorithm","robust","resource","constrained","project","scheduling","stochastic","durations","xiong","chen","yang","zhao","xing"],"keywords":[],"authorIDs":[],"dataSources":["wGMs8MzbpbdJFLyJk"]}