A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations. Xiong, J., Chen, Y., Yang, K., Zhao, Q., & Xing, L. Mathematical Problems in Engineering, 2012. Article Number: 786923
bibtex   
@article{Xiong12c,
  author = {Jian Xiong and Ying-wu Chen and Ke-wei Yang and Qing-song Zhao and Li-ning Xing},
  title = {{A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations}},
  journal = {Mathematical Problems in Engineering},
  note = {Article Number: 786923},
  year = {2012}, 
}

Downloads: 0